Week 8




Finalizing Body and Initializing Wiring

  • Conveyor belt
    • Mounted the finished conveyor belt onto the axles
    • Tested to ensure it will turn well
    • Screwed the silicone brushes to the back container
      • tested to make sure the nails on the conveyor belt would move through the brushes
  • Filter
    • Prepared filter for attachment to container by gluing conveyor belts scraps around the edges
      • Conveyor belt material glues better to the container material though the container must be sanded down
  • Pump
    • Epoxied the bottom of the pump to its proper place in the front container and cut a hole for the output tubing
  • Algae
    • Centrifuged the algae samples
    • found the concentrations of algae in the test pool and tracked its growth
  • Wiring
    • Tested 12V battery with pump
    • Obtained AA batteries for DC motors
    • Setup wiring for DC motors

Comments

Popular Posts